![]() ![]() and UK assistance, to acquire and operate its own force of SSNs. The first major initiative under AUKUS-referred to as Pillar 1 of the agreement-is to be a project for Australia, with U.S. In September 2021, the U.S., UK, and Australian governments announced a significant new security partnership, called AUKUS. Proposed sale of Virginia-class boats to Australia under AUKUS agreement. ![]() Under the Navy’s FY2024 30-year (FY2024-FY2053) shipbuilding plan, which includes three alternatives, the SSN force would reach a minimum of 46 boats in FY2030 and grow to 60, 69, or 63 boats by FY2053. The Navy’s current force-level goal, which was released in December 2016, calls for achieving and maintaining a fleet of 355 manned ships, including 66 SSNs. When procured at a rate of two boats per year, VPM-equipped Virginia-class SSNs have an estimated procurement cost of about $4.3 billion per boat. Most Virginia-class boats procured in FY2019 and subsequent years are to be built with the Virginia Payload Module (VPM), an additional, 84-foot-long, mid-body section equipped with four large-diameter, vertical launch tubes for storing and launching additional Tomahawk missiles or other payloads. The Virginia-class design has been updated multiple times since FY1998. ![]() The Navy wants the next Virginia-class MYP contract to begin not in FY2024, but in FY2025. Virginia-class boats procured in FY2019-FY2023 were procured under a multiyear procurement (MYP) contract. Virginia-class boats have been procured at a rate of two per year. The Navy has been procuring Virginia (SSN-774) class nuclear-powered attack submarines (SSNs) since FY1998, and a total of 38 have been procured through FY2023. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |